Product Details
Place of Origin: Henan, China
Brand Name: Aerial bundled cable without public lighting cable AAC/XLPE, AAAC/XLPE NTP 370.254 CAAI 3x50+NA1x35mm2
Certification: ISO 9001:2015,ISO 14001:2005
Model Number: ABC Cable
Payment & Shipping Terms
Minimum Order Quantity: 3000
Price: Negotiation
Packaging Details: Wooden case, wooden-iron drum
Delivery Time: 15-30 days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 100Km/Month
Insulation Material: |
XLPE |
Conductor Material: |
Aluminum |
Quality: |
100% Test |
Model: |
ABC Cable |
Standard: |
NTP 370.254 |
Structure: |
AAC/XLPE, AAAC/XLPE |
Core: |
3 |
Voltage: |
0.6/1KV |
Insulation Material: |
XLPE |
Conductor Material: |
Aluminum |
Quality: |
100% Test |
Model: |
ABC Cable |
Standard: |
NTP 370.254 |
Structure: |
AAC/XLPE, AAAC/XLPE |
Core: |
3 |
Voltage: |
0.6/1KV |
Aerial bundled cable without public lighting cable AAC/XLPE, AAAC/XLPE NTP 370.254 CAAI 3x50+NA1x35mm2 are used in rural power distribution in some countries and commonly used in temporary power installations such as on construction sites.
Construction:
1. Conductor: Aluminium 1350, class 2.
2. Insulation: Cross linked polyethylene XLPE.
3. Insulated neutral messenger: AAAC - All Alloy Aluminium 6201 - XLPE.
Electrical characteristics
Rated Voltage Uo/U (Um) 0.6/1 kV
Dielectric strength 4.0 kV
Time of application Dielectric strength core to screen DC 5 min.
Usage characteristics
Bending factor when installed 4 (xD)
U.V resistance Yes
Maximum operating temperature 90 °C
Overload maximum core temperature 130 °C
Short-circuit max. conductor temperature 250 °C
Aerial bundled cable AAC/XLPE, AAAC/XLPE NTP 370.254 CAAI 3x35+1x16+NA1x25mm2 technical data:
Nb. of cores | Phase Cond. Cross Section (mm2) | Phase Cond. Diam. | Min. insulation thick.(mm) | Neutral Cond.section (mm2) | MIn. Insulat. Thick. neutral cable.(mm) | Outer diameter(mm) | Approximate weight(kg/km) |
3 | 50 | 8.2 | 1.52 | 35 | 1.14 | 26.7 | 666 |
Aerial bundled cable without public lighting cable AAC/XLPE, AAAC/XLPE NTP 370.254 CAAI 3x50+NA1x35mm2
Aerial bundled cable without public lighting cable AAC/XLPE, AAAC/XLPE NTP 370.254 CAAI 3x50+NA1x35mm2 package
About us
Zhenglan Cable Technology CO., Ltd.,formerly known as HENAN Zhengzhou Cable Co., Ltd., is one of the large scale backbone enterprises in China's wire and cable industry. The company's registered capital is about 4 million 6 thousand yuan and its headquarter is located in 49 floor of the South Tower of the Greenland Center of Zhengzhou high railway station (Petronas Twin Towers). The factory is located in the Zhengzhou cable science and Technology Industrial Park of the Wuzhi industrial area. It is a modern industrial park integrating advanced research and development technology and production technology.
We, Zhenglan Cable Technology Co., Ltd main products are
overhead transmission line use bare conductor(ACSR, AAC, AAAC etc)
1-35kv overhead transmission line use insulated conductor
power distribution use 0.6/1kv, 1.8/3kv PVC/XLPE/PE insulated LV(low voltage) power cable armored or unarmored
power distribution use 3.6/6kv, 6/10kv,8.7/10kv, 8.7/15kv, 12/20kv, 21/35kv, 26/35kv XLPE insulated MV(medium voltage) power cable armored or unarmored;
300/300V, 300/500V, 450/750V cotrol cable, house wire
We promise you real quality, competitive price, on-time delivery, one-year guarantee.
FAQ:
Q1:Is your company a factory or a trade company?
Factory, more than 20 years in China
Q2:How long can I expect to get the sample?
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~7 days. You can use your own express account or prepay us if you do not have an account.
Q3:What are your payment terms?
We normally accept T/T 30% deposit, 70% balance before delivery as the main payment terms, and other payment can also be negotiated. Trade assurance on is also available.
Q4:What’s the delivery time?
Sample order needs 3~5 days. Formal order depends on the quantity. Usually it needs 7-30 days after get your payment.