Product Details
Place of Origin: Wuzhi, Henan, CN
Brand Name: Zhenglan Cable
Certification: ISO 9001:2015,ISO 14001:2005; CCC
Model Number: LV ABC cable AAC covered with XLPE insulation
Payment & Shipping Terms
Minimum Order Quantity: 200-5000m depends on the specificaion
Price: Negotiable
Packaging Details: Wooden drum, iron wooden drum or as required
Delivery Time: 10 days
Payment Terms: L/C,T/T
Supply Ability: 50000 M/day
Conductor Material: |
AAC |
Insulation: |
XLPE |
Standard: |
IEC |
Voltage: |
0.6/1KV |
Port: |
Qingdao |
Numer Of Cores: |
4 |
Conductor Material: |
AAC |
Insulation: |
XLPE |
Standard: |
IEC |
Voltage: |
0.6/1KV |
Port: |
Qingdao |
Numer Of Cores: |
4 |
Application
Aluminium overhead cables are extensively used in overhead power transmission line and used in city streets and green area, overhead lines closing to the building , the urban construction site and transformer wiring occasion etc.. It improves the safety and reliance of electrified wire netting.
1. The rated voltage U0/U is 0.6/1KV.
2. Long-term allowable working temperature of cable conductor: PVC and polyethylene insulation should not exceed 70℃; cross-linked polyethylene insulation should not exceed 90℃.
3. The laying temperature of the cable is not lower than -20℃.
4. The allowable bending radius of the cable: if the cable outer diameter (D) is less than 25mm, it should be no less than 4D; if the cable outer diameter (D) is 25mm and above, it should be no less than 6D.
|
Phase |
Phase |
Phase |
Approx.Overall Diameter |
Min.Bending Radius |
Max. D.C. Resistance of Conductor at 20ºC |
|||
|
AAC+UV-XLPE |
Compact Conductor |
UV-XLPE Insulation |
||||||
|
No.X Normal Cross Section of Cores |
No.of Al Wires |
Overall Diameter |
Thickness |
Min. |
Diameter |
|||
|
No. X mm2 |
- |
mm |
mm |
mm |
mm |
mm |
kN |
ohm/km |
|
4 X 16 |
7 |
4.8 |
1.2 |
0.98 |
7.2 |
17.42 |
2.07 |
1.91 |
![]()
![]()
About Zhenglan Cable Technology Co., Ltd
Zhenglan Cable Technology CO., Ltd.,formerly known as HENAN Zhengzhou Cable Co., Ltd., is one of the large scale backbone enterprises in China's wire and cable industry. The company's registered capital is about 4 million 6 thousand yuan and its headquarter is located in 49 floor of the South Tower of the Greenland Center of Zhengzhou high railway station (Petronas Twin Towers). The factory is located in the Zhengzhou cable science and Technology Industrial Park of the Wuzhi industrial area. It is a modern industrial park integrating advanced research and development technology and production technology.
FAQ
Is your company a factory or a trade company?
Factory, more than 20 years in China
How long can I expect to get the sample?
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~7 days. You can use your own express account or prepay us if you do not have an account.
What are your payment terms?
We normally accept T/T 30% deposit, 70% balance before delivery as the main payment terms, and other payment can also be negotiated. Trade assurance on is also available.
What’s the delivery time?
Sample order needs 3~5 days. Formal order depends on the quantity. Usually it needs 7-30 days after get your payment.
What is your MOQ?
Generally it is 5000m.